Advise
Make the right decision before money is committed.
We've designed, built and maintained Malaysian data centres since 1991. Today we put that experience to work as your independent consultant, from feasibility to day-to-day operations.
One partner, the whole lifecycle
Make the right decision before money is committed.
Turn the decision into a facility that is built as specified.
Prove it works, then keep it working.
Engagements
Every engagement has a fixed scope and fee, agreed after a site walk. No surprises on the invoice.
For operating data centres that need a clear, independent picture.
Fixed fee, scoped after a site walk
Request a proposalFor new facilities and major upgrades that must work on day one.
Fixed fee, scoped after a site walk
Request a proposalFor developers and programmes that need an owner's engineer.
Fixed fee, scoped after a site walk
Request a proposalServices
Build, colocate or move to cloud. Site selection, capacity planning, business cases and investor technical due diligence.
Concept to detailed design for power, cooling, fire protection and cabling, aligned to Uptime Tier and TIA-942.
Owner's engineer, tender documents, bid evaluation, construction supervision and cost control.
Level 1 to 5 commissioning, factory and site witness tests, and integrated systems testing.
Health checks, single-point-of-failure analysis, CFD thermal modelling, and power and cooling capacity studies.
Maintenance programmes, SOPs, MOPs and EOPs, staff training and readiness for Uptime M&O.
Liquid cooling, 50 to 150 kW racks and GPU retrofits. We assess what your facility can take and what it needs.
PUE and WUE optimisation, energy audits, renewable procurement strategy and ESG reporting support.
Uptime Tier and TIA-942 gap analysis, BNM RMiT data centre requirements and ISO 27001 physical controls.
Who we work with




Case studies
Client names are confidential. The problems and results are real engineering.

An independent design review found the cooling plant was oversized for the phase 1 load profile. The developer re-phased chiller procurement and reached energisation on schedule.

We mapped every electrical and mechanical path and found two single points of failure the bank's records had missed. We closed them in a phased programme with no downtime.

We found the deliverable IT load was below the headline figure once N+1 cooling was respected. Our capex forecast became part of the price negotiation.
Yes. We do not earn commission on the equipment we specify. Our recommendations are based on your facility's needs, and we evaluate vendors on engineering merit.
If you want one accountable partner, our delivery and support team can build, commission and maintain the facility. Many clients use us for advice only, and that is fine too.
Yes. We work across Peninsular and East Malaysia, including Johor's data centre corridor, and support projects in ASEAN.
After a discovery call and a site walk, we usually send a scoped proposal within five working days.
Each engagement has a fixed scope and fee, set out in the proposal before work begins. The fee depends on the facility's size and the depth of work required.
Tell us what you are deciding. A consultant replies within one working day.