AI and high-density readiness
GPU clusters draw ten times the power of a typical rack, and air cooling cannot remove that heat. We assess what your facility can take and what it needs.
We don't sell equipment. We make sure your data centre is planned, built and run right, for developers, banks, government and investors in Malaysia.
From the TNB intake to every rack: switchgear, UPS, generators and distribution.
Chillers, air handling and airflow, sized for today's load and tomorrow's AI racks.
Where one failure could take the facility down, and how to remove that risk.
Checked against Uptime Tier, TIA-942 and BNM RMiT expectations.
Bring us in for a single decision or the whole programme. We advise first and can deliver when you want one accountable partner.
GPU clusters draw ten times the power of a typical rack, and air cooling cannot remove that heat. We assess what your facility can take and what it needs.
PUE and WUE optimisation, energy audits, renewable procurement strategy and ESG reporting support.
Uptime Tier and TIA-942 gap analysis, BNM RMiT data centre requirements and ISO 27001 physical controls.
Build, colocate or move to cloud. Site selection, capacity planning, business cases and investor technical due diligence.
Concept to detailed design for power, cooling, fire protection and cabling, aligned to Uptime Tier and TIA-942.
Owner's engineer, tender documents, bid evaluation, construction supervision and cost control.
Level 1 to 5 commissioning, factory and site witness tests, and integrated systems testing.
Health checks, single-point-of-failure analysis, CFD thermal modelling, and power and cooling capacity studies.
Maintenance programmes, SOPs, MOPs and EOPs, staff training and readiness for Uptime M&O.
A 30-minute conversation about your facility, your timeline and the decision you need to make.
We visit, review drawings and operating data, and confirm what is in scope and what is not.
A fixed scope, named consultants, deliverables and fee, usually within five working days.
We start work, report to a single point of contact and hand over documents you own outright.
Hyperscale and colocation programmes in Johor, Negeri Sembilan and the Klang Valley are racing for power allocation, water and contractor capacity. We act as your owner's engineer: we challenge designs, hold contractors to the specification and run commissioning that proves the facility before your tenants arrive.

Many in-house data centres and server rooms grew one project at a time. We find the single points of failure, map your facility against BNM RMiT and Uptime Tier expectations, and give you a prioritised roadmap you can budget for.

Public digital infrastructure has to deliver value over a 15 to 20 year life. We write tender specifications that are vendor-neutral, evaluate bids on engineering merit, supervise construction independently and witness every commissioning test.

Before you acquire, finance or develop a data centre asset, we give you an independent technical view: the true condition and capacity of the facility, the capex it needs to stay competitive, and the risks behind the headline megawatts.

Client names are confidential. The problems and the results are real engineering.

An independent design review found the cooling plant was oversized for the phase 1 load profile. The developer re-phased chiller procurement and reached energisation on schedule.

We mapped every electrical and mechanical path and found two single points of failure the bank's records had missed. We closed them in a phased programme with no downtime.

We found the deliverable IT load was below the headline figure once N+1 cooling was respected. Our capex forecast became part of the price negotiation.
Yes. We do not earn commission on the equipment we specify. Our recommendations are based on your facility's needs, and we evaluate vendors on engineering merit.
If you want one accountable partner, our delivery and support team can build, commission and maintain the facility. Many clients use us for advice only, and that is fine too.
Yes. We work across Peninsular and East Malaysia, including Johor's data centre corridor, and support projects in ASEAN.
After a discovery call and a site walk, we usually send a scoped proposal within five working days.
Each engagement has a fixed scope and fee, set out in the proposal before work begins. The fee depends on the facility's size and the depth of work required.
Tell us what you are deciding. A consultant replies within one working day.